Sectional Door Technology at Logistics Hub

As the logistics sector continues to evolve at pace, the demand for smarter, faster, and more sustainable infrastructure is growing. In response, Assa Abloy Entrance Systems has played a key role in the delivery of two state-of-the-art industrial units at Fradley Link, equipped with cutting-edge technology. Of particular note is the UK’s first major installation of the Crawford OH1142P Dual Drive sectional overhead door — a next-generation solution redefining performance standards in speed, efficiency, and sustainability.

Strategic Development in the UK’s Golden Triangle

Fradley Park, one of the UK’s most strategically located logistics hubs, continues to reinforce its position as a first-class destination for distribution and manufacturing. Located near Lichfield in Staffordshire, at the heart of the country’s Golden Triangle of logistics, this key site offers exceptional motorway connectivity and infrastructure—making it an ideal choice for major occupiers seeking sustainable and scalable warehousing solutions.

Evans Property Group has successfully completed development on the latest phase of the site, known as Fradley Link. The speculative scheme spans approximately 280,000 sq ft and includes two highly sustainable, flexible-use industrial units of 204,500 sq ft and 78,500 sq ft respectively. Both are being delivered to exacting standards, targeting BREEAM ‘Excellent’ and EPC A ratings, and are equipped with EV charging capabilities, solar-ready roofing systems, symphonic drainage, and secure cycle storage.

Loading Bay Solutions Designed to Enhance Speed

Supporting this high-specification development, ASSA ABLOY Entrance Systems was appointed to deliver a comprehensive entrance and loading bay solution in partnership with architect Kilmartin Plowman & Partners, main contractor GMI Construction Group, and developer Evans Property Group. The project represents a significant milestone for ASSA ABLOY in the UK, as it marks the first major installation of the recently launched Crawford OH1142P Dual Drive sectional overhead door — an innovation designed to deliver a whole new level of speed, efficiency, safety, and security in modern industrial environments.

High-Spec Installations Across Two Warehouses

The larger of the two buildings, at 204,500 sq ft, has been fitted with a full suite of loading bay equipment to support streamlined operations. This includes 20 standard and tall loading bays, each equipped with swing lip dock levellers, OH1142P Dual Drive doors, and mechanical dock shelters designed to accommodate a range of vehicle sizes. Complementary accessories such as dock lights, traffic control systems, and wheel guides were also installed to ensure safety and efficiency across all docking operations.

In addition, four ASSA ABLOY OH1042P level access overhead sectional doors were supplied to align with the building’s architectural palette — finished externally in RAL 7016 and internally in RAL 9002. These doors not only match the visual identity of the site but also deliver excellent thermal performance, achieving an overall U-value of 1.3 W/m²K.

The second building, at 78,500 sq ft, has been completed to a similar specification, featuring ten loading bays supported by the same combination of dock levellers, OH1142P doors, and dock shelters. Four level access OH1042P doors were also integrated, mirroring the installation in the adjacent, larger unit.

First for the Dual Drive

A standout feature of the Fradley Link development is its status as the first major UK project to incorporate the Crawford OH1142P Dual Drive sectional overhead door—ASSA ABLOY’s most advanced overhead door system to date. This next-generation solution has been designed from the ground up to meet the evolving needs of high-performance logistics environments, with a focus on energy efficiency, operational speed, and minimal maintenance.

The OH1142P Dual Drive represents a leap forward in entrance system technology. Its state-of-the-art design operates without traditional springs or cables, significantly reducing the number of moving parts and thereby cutting long-term maintenance requirements. The simplified, maintenance-friendly configuration also eliminates the need for structural preparation or additional reinforcements—saving time and space during installation and streamlining integration with modern warehouse architecture.

Engineered for speed and efficiency, the OH1142P opens and closes up to 30% faster than standard overhead doors, helping to reduce energy loss and improve internal climate control. This faster cycle time not only boosts operational productivity but also directly supports the sustainability goals of modern developments such as Fradley Link, where energy optimisation is a core performance metric.

Enhanced security is built in as standard, with automatic electric locking and remote monitoring capabilities via integrated smart technology. These features allow facilities teams to oversee and manage door operations more effectively, enhancing both safety and operational visibility across the site.

By requiring minimal structural prep and offering lower lifecycle costs through fewer components, the OH1142P Dual Drive supports a future-proof, cost-effective approach to industrial design. Its inclusion at Fradley Link signals a strong commitment to innovation from Evans Property Group and sets a new precedent for UK logistics developments.

Enhanced Safety and Sustainability at Every Bay

The dock shelters used across both units have been carefully selected to enhance energy efficiency and maintain optimal conditions during loading. Unlike sloped-roof designs that allow water run-off onto trailers, ASSA ABLOY’s flat-roof shelters incorporate integral rain channels that divert water away from the loading area—helping to protect goods and improve safety on site. The shelters accommodate a wide range of vehicle sizes and maintain consistent performance in all weather conditions.

Each loading bay also features ASSA ABLOY’s high-spec rubber dock buffers with steel face and top plate, and all wheel guides were supplied with a yellow painted finish, ensuring enhanced visibility and long-term resistance to wear and weathering.

Delivering the Future of Industrial Infrastructure

This installation reflects not just a technical achievement, but a broader alignment with the values driving the future of logistics property development—efficiency, safety, sustainability, and future-readiness. Through collaboration with Evans Property Group and the wider project team, ASSA ABLOY Entrance Systems has helped deliver a logistics hub that sets new standards in operational performance and environmental responsibility.

Fradley Link is more than a new industrial scheme — it is a model for what the next generation of distribution infrastructure can and should be. With innovation like the Crawford OH1142P Dual Drive at its core, the site is now equipped to support occupiers with the performance, reliability, and resilience required in today’s fast-moving supply chain environment.

similar news

ASSA ABLOY Entrance Systems introduces a revolution in safe and secure truck docking

 

 

 

Automated Cranes at Port of NEOM

Port of NEOM, set to become an advanced and sustainable port, has marked a major milestone with the arrival of the first fully automated, remote-controlled Ship-To-Shore (STS) and Electric Rubber-Tyred Gantry (eRTG) cranes in KSA — advancing its goal to become a global hub for smart, sustainable trade.

Strategically located on the Red Sea, one of the world’s busiest maritime corridors, Port of NEOM is already serving as a critical gateway on the East–West trade route. The newly arrived state-of-the-art cranes will play a critical role in the port’s automation strategy, unlocking the potential for high-volume, high-efficiency operations. Importantly, their remote-control capability allows for a future-ready workforce model, where operators can manage equipment from secure, ergonomic environments.

Development of Port of NEOM continues at pace ahead of the 2026 opening of Terminal 1, a next-generation container terminal, with recent infrastructure milestones including the completion of a 900-meter quay wall and the deepening of the port channel to 18.5 metres — enabling the world’s largest vessels transiting the Suez Canal to call at Port of NEOM.

Terminal 1 will also feature horizontal transport automation as part of the broader goal to achieve full automation. Once operational, these technologies will significantly expand the port’s logistics capacity, driving regional industrial growth, opening access to global markets, enhancing supply chain resilience and unlocking business opportunities.

Sean Kelly, Managing Director of Port of NEOM, said: “The arrival of our first automated cranes marks a tangible milestone as we lay the foundations for an advanced, future-ready port. We’re not only accelerating industrial growth in northwest Saudi Arabia, we’re setting a new benchmark for performance, efficiency, innovation and establishing a vital trade gateway for the Kingdom and the region beyond.”

In parallel with its investments in infrastructure and automation, Port of NEOM is also committed to developing local talent, including training Saudi women to take on high-tech roles. Central to this effort is a pioneering initiative to train the next generation of Production Specialists to gain the skills to become remote crane operators, thereby helping shape a more inclusive future for the logistics and industrial sectors.

Ten participants from the Tabuk region are currently enrolled in an intensive two-year program that blends technical instruction and hands-on training with dedicated mentorship. Hajjer Alatawi, a trainee participating in the program, said: “This experience has shown me that port logistics is far more complex than just moving cargo; it’s about teamwork, precision and responsibility. Seeing more Saudi women entering this space gives me hope for a future where industries are defined by skills, not gender.”

By empowering Saudi workers with high-tech skills, Port of NEOM is supporting NEOM’s vision of being a catalyst for a sustainable, diverse and innovative ecosystem that enables regional economic resilience and advances the goals of Saudi Vision 2030.

similar news

NEOM and DSV Establish Logistics Joint-venture

 

Körber Supply Chain Expands in Portugal

Körber Business Area Supply Chain celebrated the groundbreaking of its newest manufacturing facility in Portugal, marking a major milestone in the company’s continued investment in innovation, capacity, and people. Located in the Ermida Industrial Park in Santo Tirso, near Porto, the new site will serve as a flagship for Körber’s operational excellence.

The groundbreaking ceremony, held 2nd June, welcomed Körber’s Porto leadership team, the City Hall President Dr. Alberto Costa, and strategic partners to celebrate the beginning of the construction. With this symbolic event, Körber underscores its strategic commitment to long-term growth and industrial leadership.

“With the groundbreaking of our new facility in Santo Tirso, we are investing in state-of-the-art technology, a highly skilled workforce, and a strong future for Körber and the Porto region,” said Körber CEO Stephan Seifert. “This project underlines our global growth strategy and demonstrates our belief in Portugal’s potential and innovative spirit. Together with our teams, partners, and the local community, we aim to set new standards for the future.”

Factory for the future

Expected to be in operation by the second half of 2026, the new 11,400-square-metre site will significantly expand Körber Business Area Supply Chain’s logistics and manufacturing capacity. The facility will focus on the development and production of Körber’s state-of-the-art technology for supply chain solutions, including mechanical, electrical, and software automation integration.

Designed to accommodate up to 60 flexible workstations, the factory will also feature:

• A Research and Development area for prototyping and innovation
• State-of-the-art-showroom with automation technologies
• BREEAM “Very Good” certification for sustainability
• Advanced testing areas for each equipment stream


The new factory supports Körber’s strategic pillars of sustainable growth, best-in-class solutions, and operational excellence. It also positions Portugal as a key industrial and innovation hub within Körber’s global network.

“This investment will allow Körber to further strengthen our market position in Europe and globally, and highlights Körber’s confidence in Porto” said Helena Garriga, Körber Executive Board Member and President Business Area Supply Chain. “This is a strategic step to strengthen our leadership in the global intralogistics market.”

Körber is proactively strengthening its teams across the organization to support competitive growth, with plans to employ over 400 full-time staff in Porto by the end of 2025. New local job opportunities will span nearly every area of the business: Customer Service, Engineering, R&D, Manufacturing, Logistics, Quality Assurance, Procurement, Project Management, Solution Design, and Sales.

Following the groundbreaking ceremony, foundation work will begin in July 2025, with operations expected to begin by the second half of 2026. Körber will continue to engage with Invest Santo Tirso and other regional partners to create new employment opportunities, invest in local skills development, and collaborate with universities and training institutions.

similar news

Körber and Dexory Partner for Warehouse Operations Visibility

 

Subscribe

Get notified about New Episodes of our Podcast, New Magazine Issues and stay updated with our Weekly Newsletter.